Residential

Pre-formed junction sewer connection

Pre-formed junction sewer connection

Residential

  • Service Provided: Foul water sewer connection, manhole installation, full reinstatement
  • Client: Residential property connection
  • Asset Owner: Anglian Water
  • Depth: 2.5m
  • Location: Cambridgeshire
  • Existing Sewer: 150mm diameter
  • New Lateral Connection: 100mm diameter
  • Connection Method: Pre-formed junction with flexible couplers
  • Licence: Section 50 with full road closure

Overview:

Premier Drainage Solutions successfully completed a foul water sewer connection in Cambridgeshire, connection via a pre-formed junction onto an existing 150mm Anglian sewer within the highway. This project involved excavation depth to 2.5 metres, road closure, and reinstatement to strict highway standards — all delivered to Anglian Water’s asset specifications.

Key Requirements & Challenges:

  • Highway Location & Traffic Management:

    The connection point was located within a live carriageway, and due to the depth and layout, a full road closure was required. This introduced a 12-week Section 50 licence lead time, necessitating careful planning and local authority coordination.

  • Depth of Excavation (2.5m):

    Excavated using a 3-tonne machine, with safety and protection measures in place to ensure stability and protect the existing infrastructure.

  • Precise Connection Method:

    The existing sewer was cut and replaced with a new 150mm pre-formed junction. The connection was secured using two flexible couplers, ensuring long-term integrity under ground pressure and flow conditions.

Our Solution:

  1. Lateral Sewer Installation:

    Laid a new 100mm lateral pipe on a stone bed and surround, leading to a newly installed pre-cast concrete manhole at the property’s boundary.

  2. Full Road Closure Management:

    Developed and implemented a diversion route to safely direct traffic during works. We worked closely with local authorities to gain approval and meet all safety regulations.

  3. Highway Reinstatement to Specification:
    • Compacted MOT Type 1 in layers using a mechanical trench rammer.
    • Cut edges sealed with bitumen edge sealer before applying the specified asphalt.
    • Finished with thermoplastic overbanding tape to prevent water ingress.

At Premier Drainage Solutions, we do not rely on temporary reinstatements. We believe in completing work permanently and to the highest standard, preventing future disruption and repeat visits.

Outcome:

  • Sewer lateral connection completed to Anglian Water standards
  • Full reinstatement carried out to highways specification
  • Project delivered safely with approved road closure and clear diversion
  • Client received a permanent, long-term solution

Contact us

Premier Drainage Solutions
P4 Allen House Business Centre
The Maltings, Station Road
Sawbridgeworth
Herts CM21 9JX

Request a call

Our charity

MSA Trust receives no government support and relies entirely on charitable donations to fund their support services as well as research into finding the cause and cure for multiple system atrophy (MSA).